TaiWan 250kW/1.036MWh Bess Project

TaiWan 250kW/1.036MWh Bess Project

11

11

12

12

13

13

14

14

15

15

  • Case Introduction
  • Taiwan is an island due to poor development of infrastructure construction and power supporting facilities are relatively weak along with affection by typhoons and earthquakes all year round.    

     

    The project has the functions of peak load shifting and power backup. When the project is put into operation, the enterprise can obtain the profit of price difference between peak and valley, and provide security for the enterprise to use electricity safely.

     