Shandong 100MW Solar+Bess

Shandong 100MW Solar+Bess

山东泰安10MWh项目

山东泰安10MWh项目

采日西北装配基地 (1)

采日西北装配基地 (1)

山东泰安10MWh项目安装 (2)

山东泰安10MWh项目安装 (2)

  • Case Introduction
  • It is 5MW/10MWHs for Two hours Charge/Discharge.

    The project is the 1st Solar + BESS project in Shandong Province of Huaneng. It uses BMS battery management system and DC side standardized container solution independently developed by Sermatec. Its main features are short construction period, small area occupation, one-time grid acceptance, cloud platform monitoring and control, auxiliary operation and maintenance software, etc.

     